Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Manage and administer the contract and related projects | A: 119. Routine Administration of Contract and all Related Projects | 12/31/2018 | 12/28/2018 | |
Complete Environmental Clearance Documentation or Prepare Biological Assessment | B: 165. Complete Environmental Clearance Documentation | 12/31/2018 | 12/28/2018 | |
New projects identified for future funding and added to prioritized list of potential projects. | C: 114. Identify and prioritize new projects for future funding. Develop preliminary plans, projects, and/or proposals | 12/31/2018 | 12/28/2018 | |
Designs and specifications for planned projects | D: 175. Produce designs for specific projects | 12/31/2018 | 12/28/2018 | |
One, possibly two new culverts installed on Wiwaanyatt Creek that provides fish passage. | E: 184. Replace Culvert(s) on Wiwaanyatt Creek | 12/31/2018 | 08/15/2018 | |
One roughened channel diversion installed in Pine Hollow | F: 84. Install roughened channel diversion on Pine Hollow | 12/31/2018 | 08/31/2018 | |
Removal of Brownell Dam | J: 85. Brownell Dam | 11/30/2018 | 08/10/2018 | |
Two perched culverts in Pine Hollow replaced with a pre-fabricated bridge that allows fish passage. | K: 184. Replace Culverts in Pine Hollow | 12/31/2018 | 08/31/2018 | |
One New Rotary Drum Fish Screen Installed on Shingle Creek #1 Diversion | N: 69. Install Gravity (rotary drum) Fish Screen on Shingle Creek #1 diversion | 12/31/2018 | 12/21/2018 | |
One rotary drum fish screen installed on the Shingle Creek #2 diversion. | R: 69. Install Gravity (rotary drum) Fish Screen on Shingle Creek #2 diversion | 12/31/2018 | 12/21/2018 | |
One rotary drum screen installed on Pine Hollow | S: 69. Install Gravity (rotary drum) Fish Screen on Pine Hollow | 12/31/2018 | 12/21/2018 | |
One Pump Fish Screen installed on the Clausen pump in the John Day River | W: 69. Install Pump Fish Screen in the John Day River on the Clausen pump | 12/31/2018 | 06/29/2018 | |
One Pump Fish Screen installed on the Young pump in the South Fork John Day River | Y: 69. Install Pump Fish Screen in the SF John Day on the Young pump. | 12/31/2018 | 06/29/2018 | |
One new pump fish screen installed on the Thompson pump in the John Day River. | Z: 69. Install Pump Fish Screen in the John Day River on the Thompson pump | 12/31/2018 | 12/21/2018 | |
One pump fish screen installed in the North Fork John Day River on the Watkins pump | AB: 69. Install Pump Fish Screen in the North Fork John Day River on the Watkins pump. | 12/31/2018 | 12/21/2018 | |
One pump fish screen installed in the John Day River on the Kimball pump. | AC: 69. Install Pump Fish Screen in the John Day River on the Kimball pump. | 12/31/2018 | 09/28/2018 | |
One Pump Fish Screen installed in the John Day River on the Weedman pump. | AL: 69. Install Pump Fish Screen in the John Day River on the Weedman pump. | 12/31/2018 | 06/29/2018 | |
One new headgate installed at Pine Hollow in the Rock Creek drainage | BB: 148. Install New Headgate at Pine Hollow | 12/31/2018 | 09/28/2018 | |
One in-channel flume or sharp crested weir installed at Pine Hollow | BC: 148. Install Water Water Measuring Device at Pine Hollow | 12/31/2018 | 12/21/2018 | |
Two Water Measuring Devices Installed in irrigation ditches on Shingle Creek - East and West | BE: 148. Install Two Water Measuring Devices in irrigation ditches on shingle Creek (East and West) | 12/31/2018 | 12/21/2018 | |
Large wood placement in approximately 0.5 miles of Wiwaanyatt Creek | BI: 29. Improve instream habitat in Wiwaanyatt Creek | 12/31/2018 | 08/15/2018 | |
Approximately 12 log weirs removed | BJ: 85. Remove log weirs from Wiwaanyatt Creek | 12/31/2018 | 08/15/2018 | |
Large wood placement in the Umatilla River | BK: 29. Improve instream habitat in the Umatilla River upstream of Dillon Dam | 12/31/2018 | 08/31/2018 | |
Large wood placement in approximately 200 ft of stream channel at Pine Hollow | BL: 29. Improve instream habitat at Pine Hollow | 12/31/2018 | 08/31/2018 | |
Completed Annual Report | BN: 132. Submit Progress Report for the period 1/1/2017 - 12/31/2017 | 04/15/2018 | 03/30/2018 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU |
|
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 119 | Routine Administration of Contract and all Related Projects | 01/01/2018 | ||||||
B | 165 | Complete Environmental Clearance Documentation | 01/01/2018 | ||||||
C | 114 | Identify and prioritize new projects for future funding. Develop preliminary plans, projects, and/or proposals | 01/01/2018 | ||||||
D | 175 | Produce designs for specific projects | 01/01/2018 | ||||||
E | 184 | Replace Culvert(s) on Wiwaanyatt Creek | 07/10/2018 | ||||||
F | 84 | Install roughened channel diversion on Pine Hollow | 08/15/2018 | ||||||
G | 84 | Install roughened channel diversion in Wiwaaynatt Creek | 07/10/2018 | ||||||
H | 84 | Install roughened channel diversion in Beech Creek at the Brooks Diversion | |||||||
I | 84 | Replace stanchion dam in Indian Creek with rock weirs | |||||||
J | 85 | Brownell Dam | 07/10/2018 | ||||||
K | 184 | Replace Culverts in Pine Hollow | 08/15/2018 | ||||||
L | 69 | Install Gravity (rotary drum) Fish Screen on Indian Creek | |||||||
M | 69 | Install Gravity (rotary drum) Fish Screen on McKinney Creek | |||||||
N | 69 | Install Gravity (rotary drum) Fish Screen on Shingle Creek #1 diversion | 06/21/2018 | ||||||
O | 69 | Consolidate fish screens on Indian Creek | |||||||
P | 69 | Install Gravity (rotary drum) Fish Screen on Little Indian Creek | |||||||
Q | 69 | Install Gravity (rotary drum) Fish Screen on Moon Creek | |||||||
R | 69 | Install Gravity (rotary drum) Fish Screen on Shingle Creek #2 diversion | 06/21/2018 | ||||||
S | 69 | Install Gravity (rotary drum) Fish Screen on Pine Hollow | 08/15/2018 | ||||||
T | 69 | Install New Pump Fish Screen on the Silbernagel pump in the Umatilla River | 11/06/2018 | ||||||
U | 69 | Install Pump Fish Screen on the North Fork John Day Smith pump | 06/21/2018 | ||||||
V | 69 | Install Pump Fish Screen in Fox Creek-Hensley | 06/21/2018 | ||||||
W | 69 | Install Pump Fish Screen in the John Day River on the Clausen pump | 06/21/2018 | ||||||
X | 69 | Install Pump Fish Screen in Bridge Creek on the Lindquist pump | |||||||
Y | 69 | Install Pump Fish Screen in the SF John Day on the Young pump. | 06/21/2018 | ||||||
Z | 69 | Install Pump Fish Screen in the John Day River on the Thompson pump | 06/21/2018 | ||||||
AA | 69 | Install Pump Fish Screen in the John Day River on the Williams pump | 11/21/2018 | ||||||
AB | 69 | Install Pump Fish Screen in the North Fork John Day River on the Watkins pump. | 11/21/2018 | ||||||
AC | 69 | Install Pump Fish Screen in the John Day River on the Kimball pump. | 11/06/2018 | ||||||
AD | 69 | Install Pump Fish Screen in the John Day River on the Corning pump | |||||||
AE | 69 | Install Pump Fish Screen in the John Day River on the Willis-kimball pump | |||||||
AF | 69 | Install Pump Fish Screen in the North Fork John Day on the Stubblefield #1 pump | |||||||
AG | 69 | Install Pump Fish Screen in the North Fork John Day River on the Stubblefield #2 pump | |||||||
AH | 69 | Install Pump Fish Screen in the North Fork John Day River on the Boyer pump | |||||||
AI | 69 | Install Pump Fish Screen in the John Day River on the Overton pump (upstream of Dayville). | 06/21/2018 | ||||||
AJ | 69 | Install Pump Fish Screen in the North Fork John Day River on the Bernhard pump #1. | |||||||
AK | 69 | Install Pump Fish Screen in the North Fork John Day River on the Bernhard pump #2. | |||||||
AL | 69 | Install Pump Fish Screen in the John Day River on the Weedman pump. | 06/21/2018 | ||||||
AM | 80 | Install Siphon under Little Indian Creek | |||||||
AN | 80 | Install Siphon under Wiwaanyatt Creek | 07/10/2018 | ||||||
AO | 80 | Install Fish Exclusion Barrier on the Enterprise Ditch along the John Day River | |||||||
AP | 80 | Install Fish Exclusion Barrier on the Enterprise Ditch along the John Day River | |||||||
AQ | 80 | Install Siphon under McKinney Creek | |||||||
AR | 148 | Install New Headgate on Mountain Creek | 06/21/2018 | ||||||
AS | 148 | Install New Headgate on Little Indian Creek | |||||||
AT | 148 | Install New Headgate on Moon Creek | |||||||
AU | 148 | Install New Headgate on Lightning Creek | 06/21/2018 | ||||||
AV | 148 | Install New Headgate on Indian Creek | |||||||
AW | 148 | Install New Headgate on McKinney Creek | |||||||
AX | 148 | Install New Headgate on the Bear Creek #7 diversion | 06/21/2018 | ||||||
AY | 148 | Install New Headgate on the West Branch of Bridge Creek at the #1 diversion | 06/21/2018 | ||||||
AZ | 148 | Install Water Measuring Device on Indian Creek | |||||||
BA | 148 | Install Water Measuring Device on McKinney Creek | |||||||
BB | 148 | Install New Headgate at Pine Hollow | 08/15/2018 | ||||||
BC | 148 | Install Water Water Measuring Device at Pine Hollow | 08/15/2018 | ||||||
BD | 148 | Install Water Measuring Device in Moon Creek | |||||||
BE | 148 | Install Two Water Measuring Devices in irrigation ditches on shingle Creek (East and West) | 06/21/2018 | ||||||
BF | 148 | Install Headgate on Beech Creek at the Panama Diversion | 06/21/2018 | ||||||
BG | 148 | Install Headgate on Buckhorn Creek at the Campbell Diversion | 06/21/2018 | ||||||
BH | 148 | Install Water Control Structure (Headgate or Water Measuring Device) | 06/21/2018 | ||||||
BI | 29 | Improve instream habitat in Wiwaanyatt Creek | 07/10/2018 | ||||||
BJ | 85 | Remove log weirs from Wiwaanyatt Creek | 07/10/2018 | ||||||
BK | 29 | Improve instream habitat in the Umatilla River upstream of Dillon Dam | 07/12/2018 | ||||||
BL | 29 | Improve instream habitat at Pine Hollow | 08/15/2018 | ||||||
BM | 29 | Improve instream habitat in Desolation Creek | |||||||
BN | 132 | Submit Progress Report for the period 1/1/2017 - 12/31/2017 | 01/01/2018 | ||||||
BO | 185 | Periodic Status Reports for BPA | 01/01/2018 |